SENNEBOGEN 6130 HD transports tons of gravel

Heavy mining work is underway at the lake Alperstedter See close to Erfurt – with a SENNEBOGEN 6130 HD duty cycle crawler crane with drag shovel (Fig.). Equipped with a 5.6 m³ dragline, the machine extract 2500 m³ of gravel each day to depths of up to 5 m. The 29.9 m boom is used to pour material over a large heap before it is sieved after a short drying period and transported on with a HGV. The majority goes straight to the ICE Trasse Berlin-Nürnberg construction site. The pouring work with the SENNEBOGEN 6130 is carried out by construction company Himmel und Papesch on behalf of K+B Kies und Beton GmbH. In order to master the high transport quantities, the decision makers chose the heavy SENNEBOGEN duty cycle crawler crane and are just as happy with the decision as the driver, who praises the outstanding stability, smooth running characteristics and operating comfort in the cab in particular.

 

The robust HD duty cycle crawler cranes from SENNE­BOGEN are suitable for universal use, have been operated in a wide range of different fields all over the world for almost 60 years and represent manageable technology, outstanding stability and quality. The HD duty cycle crawler crane product range from SENNEBOGEN includes 9 models with loads of 20-200 t and motor performance of 119-570 kW.

 

Media Partners



Market Focus Crushers + Screening Technology

AT Russian Yearbook

AT Russian Yearbook 2011 PDF-Download

INFO SPACE

AT English Edition 10/2011 ➤ Read more
Reports ➤ Read more


 

Media 2011

AT-Media 2009

The independent trade journal AT Aufbereitungs Technik – Mineral Processing has informed its readers for 50 years in all areas of mechanical and mechanical-thermal processing engineering in the subject areas of sand and gravel ...   

subscription/test subscription

You want to order a subscription/test subscription?
If so you are right here!  Here is how to order ...